RAIL FOOT INSULATIONS

One-piece rail foot insulation

Are attached to the rail foot before concreting. For our one-piece version the rail filling elements have a recess, to ensure a perfect fit.
 

Two-piece rail foot insulation

Also be placed before concreting. The lip can then be easily removed by hand (see figure).
 

Rail foot support with defined sinking values

We supply the different profiles for all usual, required sinkings.

Druckversion | Sitemap
© Regum GmbH